Wiri bridge
01 August 2022 - 18 August 2023
- Manukau
- Complete
A new bridge connecting neighbourhoods.
The project was the final piece of the puzzle to achieve the wider programme objectives of extending the walking and cycling network into central Manukau
- The previous narrow timber pedestrian bridge was tired and not fit for purpose and was much in need of an upgrade.
- The new steel bridge is more fit for purpose, is low maintenance and accommodates walking and cycling.
- The bridge was built in the same location, using the existing abutments, but providing with new widened approaching footpaths. The bridge was also raised to reduce the need for slopes and ramps making for a more accessible connection. Chicanes were included to discourage high speeds and unwanted vehicles entering the bridge.
- The bridge has a width of 3m meters - providing a shared path with ample space. Handrails on either side provide rest points along the bridge for those needing them.
- Soft landscaping with a large selection of native plants and some productive trees have been planted.
- The project was one of the final pieces of the puzzle to achieve the wider programme objectives of the Transform Manukau programme. It extends the walking and cycling network into central Manukau, as well as providing a viable, pleasant and safe route for residents from Wiri and central Manukau